From diamond mine plant renovation to port crane engineering and national infrastructure protection — projects that demonstrate our scale and capability.
Comprehensive bid for the revival of MIBA S.A. — the Société Minière de Bakwanga — one of the most important diamond mining operations in the Democratic Republic of Congo. This tender (DOU/01/2025) covers the complete renovation and recommissioning of the NLK2 kimberlite processing plant.
Massif 1 certification service and comprehensive geological assessment of the mining polygon.
Supply and installation of ore classification station with advanced sorting technology, digital ore grade control systems.
Overland conveyor system for material transport from the mining polygon to the processing plant.
400 TPH kimberlite processing: primary/secondary crushing, classification, large diamond recovery (XRT), and DMS concentration.
Diamond sorting facility with optical and X-ray sorting machines, conveyors, and security systems.
Industrial water pumping station for the kimberlite plant with water treatment and recycling systems.
Pilot plant for processing geological samples to evaluate ore body characteristics and diamond content.
Pilot plant for processing plant samples to optimize processing parameters and recovery rates.
Replacement of 4 Bateman scrubbers with MechProTech TITAN 3.0m x 7.8m, 360kW units (same as Liquabong Diamond Mine, Lesotho). Primary jaw crusher repair or replacement. New conveyor systems with Class 516 belts.
New Warman/Weir 10/12 DMS feed pump. 2 Multotec ceramic-lined DMS cyclones replacing the original 4. New ferrosilicon supply and regeneration unit. Complete vibrating screen refurbishment.
Containerized MCC with 2x 12m buildings. SCADA control via PLC DELTA. 270-degree view control room with air conditioning. 550V three-phase 50Hz power distribution.
XRT (X-ray transmission) large diamond sorter before secondary crushing. Grease belt/table recovery systems. Full security enclosures and monitoring.
Fabrication and supply of critical mechanical components for the Office National de Transport (ONATRA) at the Port of Kinshasa. Two key contracts covering the 45-tonne Portique crane gear replacement and the complete mechanical overhaul of the Ndolo Naval Yard transborder.
Supply of replacement gears, axles, and SKF bearings for the immobilized 45-tonne gantry crane at the Port of Kinshasa.
Complete mechanical overhaul of the transborder at the Chantier Naval Ndolo, including bevel gear sets, pinions, drive wheels, planetary gears, and bronze bushings for the translation drive system.
Supply of Zincodic Extreme 80 1K cathodic protection coating to the Société Nationale d'Électricité (SNEL) for the protection of 3,000 electrical transmission pylons across the DRC. This project addresses the critical corrosion deterioration of the national power grid infrastructure.
Large-scale deployment across electrical transmission pylons nationwide. Zincodic supplied in 12kg pails, with quantity calculated per pylon based on surface area.
ISO 12944 C5H and IM3 certified. The world's first non-isocyanate polyurethane cathodic protection coating system.
Lifespan equivalent to hot-dip galvanization. 85% zinc content, 100% cathodic protection. Hydrophobic, non-flammable, zero VOC.
From component fabrication to complete plant refurbishment, we deliver at scale. Let's discuss your requirements.